The method for placing rock will either be Method A or Method B, whichever the contract designates, as discussed under Section 4-7203A, Rock Slope Protection, earlier in this section. There are three material gradation requirements based on required rock layer thicknesses. Erosion control is an important element of successful slope protection. Where applicable, inspect the footing areas and foundations for evidence of instability or areas where hydrostatic pressures may develop. Need quick pricing on Erosion Control Fabric? Before construction of any type of slope protection, review the plans, Standard Specifications, special provisions, any pertinent preliminary test data, and the location of the installation. Intermittent inspection of placement of slope protection, slope paving, and fabric operations. A Shoreline Erosion Control project would likely require fabric in the 10oz to 16oz weight range. Roll size is 15'x300 Equivalent to Mirafi 1120NC or Skaps GT112 (Click here for spec) > Values shown are based on Table 873.3A dimensions and an assumed specific gravity of 2.65. concreted-rock slope protection (1/2 t, class vii, method b) (ton) 723215 concreted-rock slope protection (1/4 t, class v, method b) (cy) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) 729011 rock slope protection fabric (class 8) 729012 rock slope protection fabric (class 10) 750020 rigid rail fall protection system Rock Slope Protection practice is intended for slopes too unstable for revegetation practices alone. Mirafi 160N is a lightweight nonwoven geotextile that meet AASHTO M288 Class 2 geotextiles for separation and subsurface drainage. (b) Paving fabric specification requires a minimum mass of 4.1 sy/oz. the contract cost database using the most recent year of data. 0000009975 00000 n Class 2 is the default Class for M288 applications. /Type/ExtGState All items. ), Geocomposite Wall Drain (w/ 6oz on 1 or 2 sides - Please specify.). Place a highly permeable and appro-priately sized geotextile filter fabric on the prepared slope following the manufacturer's recommendations. Caltrans requires the use of these new RSP gradations starting August 1st, 2016 in new projects and those not yet at 30 percent PS&E stage. Center splash basin . Check the area to be protected to ensure that the required expansion joints are in place. (see Riprap Slope Protection Worksheet). 0000007029 00000 n {s9y^ 1 0 obj For Type R, F, or Common stone riprap, provide Type 2 filter fabric when shown on the plans. For RSP Classes IX thru XI, use Class 10 RSP-fabric. Geotextiles have been in use for thousands of years dating back to the Egyptian Pharaohs. Provide filter fabric in accordance with DMS-6200, Filter Fabric. For protection stone riprap, provide Type 2 filter fabric unless otherwise shown on the plans. They are designed to protect against raveling-type rockfall that involves small-volume slope failures (up to about 7.6 m3 or 10 yd3) or blocks up to 1.5 m (5 ft), depending on the strength of the mesh used (Muhunthan et al. 3, METHOD B) (CY), ROCK SLOPE PROTECTION (NO. /Length 5601 Weight will vary based on density of rock available for the project. =w (j($M/!bMbo,iDjQL1{L! The plans indicate the minimum depths of foundations. This translates to a 0.75H: 1V incline and is shown below. 0000008331 00000 n 0000009682 00000 n /OPM 1 Our TerraTex brand offers full-spectrum performance delivery - groundwater filtration and drainage, soil separation and reinforcement, geomembrane protection, sprayed liner substrate, oil-and-gas industry drilling pad and access-road enhancement, as well as pavement overlay and bond-breaker applications. 3, METHOD B) (TON), STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) (ENGMET). Use all suitable material in the work. <>/XObject<>/Properties<>>>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> 2019-07-30T13:47:33-04:00 To ensure the success of Method A, ensure that the bearing of rocks from one to the other follows specifications and that the use of chinking rocks is limited to filling voids. For measuring concrete or shotcrete, refer to Sections 4-90, Concrete, or 4-53, Shotcrete, of this manual. Benchmark inspection of sampling and testing of rocks. FDM 10-10-3 <> If excess concrete remains on the surface, the finished product, when used in streams, will be too smooth and, along the protection, velocities will increase beyond those intended during design. Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. "QamV(Z3VL> DM[2TI=lGQx7 UoFK1: V;39LFOr7LxPF{BL3he6X^@v[QhWiF!l3F) RTIBfx0.T F%n3h80Q,`[2xa%VLP /WD@j rK .9{N[#o/Fad#OK6YeqsyHl2M)V]/Nf(V?!1Oaw)fM 8JG)31m. The equilibrium soil-to-geotextile system that allows for adequate movement of a liquidin the plane of the geotextile over the service lifetime of the application. Complete the Patio or Walkway 6. Draw Down Device, Sediment Basin Schematic - Vert. IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN This handbook includes new and revised details for the various practices that are used in the development of erosion and sediment control plans. 0000000871 00000 n Enter the item description of the code you wish to search for: It consists of a layer of very large stones interlocked together and acts as a barrier on slopes that are unstable because of seepage problems or in areas that are receiving a large concentrated flow. Graniterock has a 101-year history of providing high quality products and service. Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33 times the length. Contact our sales team at 1-863-270-8118 to discuss your erosion control requirements. Products with a are available to meet BABA (Build America, Buy America) requirements. endobj Click on a heading to sort by that heading. The contractor must also ensure the construction of adequate returns and keys at the ends. Whether you're speeding down a slope or cycling uphill, the F5 can be worn in a number of ways to fit your training and needs. Rock riprap consists of loose rock that is dumped on the slope and distributed. For details about concrete production, review Section 4-90, Concrete, of this manual. Technical Support available for assistance. Copyright Maryland.gov. Properly designed slope protection and stabilization has to include two components: a vegetational-biological and a mechanical-structural component. endstream 0000002021 00000 n :t4NV]j{/mtqF*sx[%M 5%(/%(Z-F|[atK5[~{a~EwDCV:/#K)f~7*RsAnnJa>Jg-m^>\V7EOG3o?nGYIFze/l( I!&VXo]mm#7I0:EK7_LFwek Ensure the timber spacers are of the required material and spaced as planned. JavaScript is required to use content on this page. (You may enter part of the word or the whole phrase). More simply put, if it is made of fabric and buried in the ground it is probably a geotextile! Ensure that the contractor performs concrete finishing as specified and that the slope paving is cured by one of the specified methods. Rock Channel Protection Paved Gutter 601.13 Basis of Payment 601.01 Description. /Filter/FlateDecode US 160NW resists ultraviolet and biological deterioration, rotting, naturally encountered basics and acids. Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. Please enable JavaScript in your browser. For measurement and payment, do the following: Chapter 1 - Caltrans Construction Organization, CalOES: Power Outage and Fire Recovery Resources. YOU MUST NOTIFY US FABRICS BEFORE RECEIVING PRICING. 9 0 obj Be sure to consult your local project engineer or construction professional about the rock sizing and particular . Slope protection is usually needed to protect the upstream slope against erosion due to wave action. endobj Mirafi 140N is a lightweight non woven geotextile that meets AASHTO M288 Class 3 geotextiles for separation and subsurface drainage. Erosion control devices provide direct protection to the soil surface therefore, are considered one the best measures for preventing erosion. Retaining Walls & Slope Stability Refer to Section 4-96, Geosynthetics, of this manual for guidelines on inspecting and accepting rock slope protection fabric. The finish surface must be roughened by brushing to expose rocks. Slope protection structures are to be used where concentrated water will cause excessive erosion on existing and/or recent cut and fill slopes. 3. (b) Paving fabric specification requires a minimum mass of 4.1 sy/oz. In making such a decision, observe the following: Take pictures to document existing conditions and verify that Form CEM-3101, Notice of Materials to Be Used, includes the materials for slope protection. Geofabrics offers a range of engineered slope, embankment and retaining wall solutions of use in transport infrastructure projects. Temporary structures shall be left in place until adequate vegetation and the permanent . Source: Caltran Highway Design Manual, Chapter 870 2019-07-30T13:44:04-04:00 The following common types of slope protection are covered in this section: Other protective devices are used in conjunction with highway construction, and when used, they are included in the contracts special provisions. endobj RG12N Nonwoven Geotextile with a 300 lbs grab tensile strength and a flow rate of 65 gallons a minute per square foot. To respond to the different problems associated with instability of rock faces, Geofabrics also has a broad range of independently verified rockfall mitigation systems. AASHTO is typical mass of 4.1 sy/oz. 2, METHOD B) (TON) (ENGMET), ROCK SLOPE PROTECTION (NO. Geosynthetic Bond Breaker (Call for product. (For large riprap, consider a four inch layer of sand to protect the . 0000004014 00000 n If using geotextile fabric, place on the smoothed foundation, overlap the edges at least 12 inches and secure with anchor pins spaced every three feet along the overlap. HToL[U?Ayb:V;%Y48{RMLIlq&+J[mNN?J;A? Note any changes that may have occurred between the preliminary design studies and the start of construction. >> +NXR!ft]l|\P2. When changes are made, maintain records of details, depths, heights, and other dimensions, and enter these on the as-built plans. Neoloy Tough-Cells in slopes prevent erosion, enable drainage and stabilize the slope to provide a green surface cover. 0000005681 00000 n Copies of these details are made available below in both Adobe Portable Document Format(PDF) and AUTOCAD Drawing (DWG) file formats. For method A placement and the class of RSP described, comply with the rock grading shown in the following table: For method B placement and the class of RSP described, comply with the rock grading shown in the following table: Rock must have the values for the material properties shown in the following table: Select rock so that shapes provide a stable structure for the required section. Soil Stabilization Matting - Slope Application, Perm. Soil Stabilization Matting - Channel Application, Perm. >> Barrier Landscape Edging & Paver Edging 6'/8. item code description; 729012 rock slope protection fabric (class 10) 729011 rock slope protection fabric (class 8) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) The color shall be black unless otherwise specified in the contract documents. C-15 Permeable rock jetties (fish habitat structures) C-8 C-16 Close-up of permeable rock jetty C-8 C-17 RSP tied to solid rock outcrop, natural impermeable retard (jetty) C-9 C-18 Soil-filled voids, natural vegetation C-9 C-19 Channel cut through deposited beach sand C-10 C-20 Layers of deposited sand C-10 The bid item list and plans will specify which type of slope protection is to be performed. The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. Thishandbook includes new and revised details for the various practices that are used in the development of erosion and sediment control plans. Contract Cost Data Project Details. <>/Metadata 7 0 R/OpenAction 8 0 R/Outlines 110 0 R/PageLayout/SinglePage/PageMode/UseOutlines/Pages 11 0 R/StructTreeRoot 137 0 R/Type/Catalog/ViewerPreferences<>>> (a) Exception: US 250NW is 5 pounds short on "grab breaking load" for Sediment Filter Bags. 0000002336 00000 n 1800 Washington Blvd., Baltimore, MD 21230, Stormwater, Dam Safety, and Flood Management Home, Plan Review for State and Federal Projects. Broken-concrete slope protection consists of placing broken concrete from job site locations identified within the contract. rock slope protection (3/8 t, class vi, method b) (ton) 723060 rock slope protection (300 lb, class iv, method b) (cy) . Slope Protection consists of rock, concrete, or concreted rock or slope paving, ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE, THE PLACEMENT METHODS DESIGNATED BY CALTRANS, ADVANTAGES OF USING RIP RAP OR STONE PROTECTION FROM WILSON QUARRY (AROMAS), Make certain of the Product RequiredProject Service Requirements, Specifying Agency (Caltrans, Green Book, Army Corp or Other), Special Provisions addressing additional specifications, Certification Required (Submittals) Caltrans, Army Corps, other agency or engineer, Quantity Required (Specific GravityConversion Tons to Cubic Yards), Product Availability (Available when required, can handle Daily Shipping Requirements), The Reputation of your Supplier and their Products & Services, 100% Crushed Granite (Provides Superior Stability and Durability), Many different Rip Rap types available:All Caltrans Classes and Sizes, High Daily Production and Shipping Capacity (Can Handle Large & Small Jobs), Graniterock can provide delivery to your jobsite if desired. When slope protection is paid by volume, review the plans and quantity calculations in the resident engineers file to determine if there is sufficient detail and accuracy to be used in the project records. The concreted-rock slope protection method is used where large rock is not economically available in large quantities, yet a heavy, service type of protection is required. <> Natural Resources & Energy Infrastructure, Energy - Power Generation - Renewables - Solar, Energy - Power Generation - Renewables - Wind. 5 0 obj Maximum slope 1.5:1 horiz:vert, (67% or 34) or flatter, and is limited to slopes < 30' of uninterrupted length. 0000002044 00000 n Slope Protection consists of rock, concrete, or concreted rock or slope paving ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE Stability: Angular shapes may be used on any planed slope Durability: Resist degradation and have a durability of 52 minimum (Caltrans) Consistency: Product is the same load after load. GHnBc__'h1'u]SO0P+R&yGeJ$FP?cSp28 1}9AQ #T6Bc*)_vU"]T hY# Check to ensure that slopes and foundation areas are graded and compacted to specified tolerances. (a) Exception: US 250NW is 5 pounds short on "grab breaking load" for Sediment Filter Bags. Placement of Bedding Material 1. 6 0 obj Obtain initial samples and have them tested for the specified attributes. Transportation Specifications Section 96-1.02I for Rock Slope Protection Fabric, Class 8, nonwoven geotextile. requirements. If you have any questions about the consistency of the gabions, you may also order the unit weight to be verified during the course of the work. Other Names Rock Slope Protection. B. Cables. 0000005658 00000 n Take care not to tear the filter fabric during installation. Vegetation (see . 10 0 obj Review Section 4-90, Concrete, of this manual for details about concrete production. The best slope protection type for a given situation depends on the conditions where the installation is to be made, availability of protection material, cost of the various types, and protection desired. For combination slope/bench systems in TYPE A soil and a trench depth of less than 8 feet, the steepest maximum allowable slope is 53 degrees from the horizontal. Project Details For EA 04-0A0204 ITEM NUMBER 729011 ROCK SLOPE PROTECTION FABRIC (CLASS 8) Bid Opening Date (mm-dd-yyyy): 04-21-2021 District-County-Route-Postmile: 04-SON-1-R15./R15.7 Quantity: 220 SQYD Unit Price: $21.50 Total Price: Type of work: REALIGN ROADWAY KEwAx{N*$J }COpU?s{bs. The maximum height of the vertica l lower portions 3.5 feet. This work consists of protecting slopes, channels, and gutters with riprap, interlock precast concrete blocks, concrete, grouted items, tied concrete block mats, crushed aggregate, or rock items. 4 0 obj Keep records up to date. Your search for great running gear starts and ends with us. Rock Slope Armor is a layer of rock, such as ditch lining rock, cobble rock, concrete rubble, or riprap, which is hand or mechanically placed on an erodible soil slope. 2. 1 Cold storms bringing wind, rain and low-elevation snow heavy at times are forecast through early March. At the terminals of protection, ensure the contractor is particularly careful to avoid erosion and undercutting. in a MS Word document format from the For maximum effect, both components must be integrally planned prior to road construction. For details about concrete production, review Section 4-90, Concrete, of this manual. Riprap can be used to stabilize slopes to prevent erosion and provide support. endobj You may check the size of rock by roughly measuring the size and converting the volume to mass. 0000007052 00000 n Verify the types of measurements and records necessary to support payment for the work. RSP-fabric Type of geotextile and quality requirements per Section 96 Rock Slope Protection Fabric of the Standard Specifications. Ensure that the contractor places the fabric before placing the rock slope protection. If there are no prevailing agency specifications, it is recommended to follow AASHTO M288 for subsurface drainage applications. Method A is used where the stability of the rock slope protection is considerably dependent on the manner in which the individual rocks are placed. If necessary, order additional weep holes. Provide galvanized guide rail cables a minimum 19 mm in diameter, consisting . On a cut slope, this could be due to . Inspect the rock to ensure it has been cleaned of any adhering dirt and clay and is moistened before concrete placement. When exposed aggregate slope paving is specified, ensure any concrete set retarders are used in accordance with manufacturer instructions. K@^9t% OZ$Mb Ne#^/_*Zw;*T_]k. with a minimum of 50% of the stones . If the rock contains an excess of fines or inadequate voids, the desired results may be impossible to obtain. PsVPvCHWTxml4N,P>{Ur]JBV:V,iVkNm(C d3@p/J3O//.cji-+TA3 dsU)~Ds:mp7=h&X#0C]\:k`#+VW^`0 0=F5VvL(^f 0000008354 00000 n Ensure that rocks of the specified sizes and shapes are being used. The method for placing rock will either be Method A or Method B, whichever the contract designates, as discussed in Section 4-7203A, Rock Slope Protection, of this manual. endobj <> Observe construction to ensure the contractor does the placing, finishing, and curing as specified. engineering fabric pinned to the slope, or both a . The concrete slope protection method consists of paving the embankment with portland cement concrete. Intermediate, or B dimension (i.e., width) where A dimension is length, and C dimension is thickness. Use 5 to 7 st (One call ordering and delivery). EZw5'dr=`j+2\8:U.|V,%)~h/X8ps << Any springs or water courses that might affect the stability of the design. construction contract standards page. endobj The Maryland Department of the Environment (MDE)recentlyadopted the 2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control. Nominal RSP class by median particle diameterb Nominal median Manufacturers information can be found at: A geotextile is typically defined as any permeable textile material used to increase soil stability, provide erosion control or aid in drainage. <>stream 0000013368 00000 n Use the size and composition of yarn that is recommended by the fabric manufacturer. Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33 times the length. endobj Refer to Section 6-202, Responsibilities for Acceptance of Manufactured or Fabricated Materials and Products, of this manual for additional information. Shop Lowe's for solutions to control erosion on slopes, as well. There are three material gradation requirements based on required rock layer thicknesses. The gabion method consists of placing wire mesh box-shaped baskets filled onsite with hard, durable rocks. 0000009704 00000 n Mirafi 180N is a moderate weight nonwoven geotextile that meets AASHTO M288 Class 1 geotextiles for separation and subsurface drainage. The devices include ground covers and channel liners such as: 1. Obtain rock samples for acceptance tests. You may be trying to access this site from a secured browser on the server. main search page where you can specify additional parameters. /OP true 6'' min. The gabions are placed on filter fabric as detailed in the plans and specifications. rock slope protection fabric (class 8) 591200 rock stain: 780450 rock stain: 720110 small-rock slope protection: 192032 structure excavation (rock slope protection) (engmet) Ensure concrete is cured by one of the specified methods. Rock mesh slope protection is a technique to control rockfalls . Woven Stabilization and Separation Geotextiles, - Dimensions & Weights for EcoTubes Geotextile Dewatering Tubes, - Dimensions & Weights for EnviroGrid Cellular Confinement, - Material Safety Data Sheet (MSDS) - Drainboard, - Material Safety Data Sheet (MSDS) - Stratagrid, - Material Safety Data Sheet (MSDS) - Envirogrid, - Product Advantages of EcoTubes Geotextile Dewatering Tube, - Product Benefits of EcoTubes Sludge Dewatering Tubes, - Product Benefits of US Fabrics' Foundation Drains, - Product Benefits of US Fabrics' Sheet Drains, Design/Installation Guidelines; Applications, - Comparing Old Style & New Style - Strata Geogrid, - French Drain Exterior Foundation Install, - Geogrid & Welded Wire Form Inside Corner Placement, - Installation Guideline for Separation Heavy Geotextile, - Installation Guideline for Separation Medium Geotextile, - Sheet Drain Exterior Foundation Install, - Theoretical Tube Volumes & Dewatering Capabilities, - Typical Cross Section - Vegetated Reinforced Soil Slope, - Equivalent Products for Composite Drains, - Volumes & Dewatering Capabilities for EcoTubes Geotextile Dewatering Tubes, - Geogrid Quality for Finished Product and Raw Materials, - Use Woven Geotextiles Instead of Geogrids, - Municipal Waste Water & Water Treatment w/ EcoTubes, - SRW (Segmental Retaining Wall) Drainage.